New construction of the high school in two phases in Langenhagen

Theodor-Heuss-Straße 51 30853 Langenhagen

No items found.
Construction execution:
2021
-
2023
Size in sqm:
8000

Technology

Ventilated curtain wall cladding made of fiber concrete facade from a facade system, featuring varying depths of facade structure/substructure, with surface treatment and impregnated edges on approximately 8000 sqm. The substructure consists of thermally separated components and is adjustable in three levels. The substructure is made of stainless steel/non-corrosive steel.

Client/Contractor

Prudens GmbH