New construction of Grace Hopper Comprehensive School with gymnasium in Teltow

Mahlower Straße 146 14513 Teltow

No items found.
Construction execution:
2021
-
2023
Size in sqm:
5700

Technology

It consists of a substructure made of stainless steel/aluminum, comprising facade brackets and carrier profiles in T-shape. Thermal separation elements are installed at the transition to the wall. Additionally, mineral wool according to DIN EN 13162 (s = 18 cm) is mounted behind the three facade strips made of fiber cement panels on 5700 sqm.

Client/Contractor

Prudens GmbH

Additional images of the project
No items found.